The eastbound 3600 block of Shore Drive near the intersection of Dinwiddie Road has been reduced to one lane for emergency water main repairs.

Emergency Water Main Repair Affecting Shore Drive
Wednesday, April 25, 2018
​VIRGINIA BEACH, Va. (April 25, 2018) — The eastbound 3600 block of Shore Drive near the intersection of Dinwiddie Road has been reduced to one lane for emergency water main repairs. Warning signs are posted advising motorists of the utility work. Motorists are strongly encouraged to seek alternative routes.

Water service has been interrupted for some customers in the immediate service area. For additional information, please contact Robert Wheeler with Virginia Beach Public Utilities at 757-621-6072.

A 16″ water main apparently broke about 1255am.

From Pilot article:

There was a 16-inch water line break, said Robert Wheeler with the city’s public utilities department. He said they don’t know what caused it.

Water service has been intrrupted for some customers in the immediate area.

Drivers in the area are encouraged to seek alternative routes.

It’s expected to take five to six hours to repair, Wheeler said.

How to Share Your Feedback and Review Budget Details City Council will vote on the budget on May 15; here are ways you can get more information and provide feedback.

How to Share Your Feedback and Review Budget Details at VBGov.com.

Watch Budget Presentations Online:​​

City Council will vote on the FY2018-19 Operating Budget and Capital Improvement Program during the May 15 meeting at 6 p.m. in City Council Chambers (2401 Courthouse Drive).​

Start here to review current budget proposals at VBGov.com.

Click graphic to visit VBGov.com.

Familiar with Seaview Beach & Amusement Park ?

This website and corresponding research paper were funded with a 2017 Research Grant from the Virginia Beach Historic Preservation Commission.

The website and research paper includes fascinating details and photos from yesteryear.

Start here to view the fascinating story.

In 1947, Life Magazine published a photo essay on Seaview Beach calling it “Virginia’s best-known Negro resort.” The magazine reported that up to 10,000 tourists visited the beach on the weekends. Images showed well-to-do African-American professionals enjoying social life at the beach and adjacent amusement park.1This was contrary to much of the negative media coverage of African Americans at the time and casts a light on a hidden upper-class population in Virginia.

Will Sessoms is set to announce Wednesday that he will resign as Virginia Beach mayor to take a position with the Northam administration, sources said

13 News Now reporting.

“But a push to fund improvements that will benefit residents who bike, run, and walk could make Shore Drive more popular and safer.”

View article at Pilotonline.com.

5ad0f2c1a0e8d.image

Photo Credit: Stephen M. Katz | The Virginian-Pilot

In 2007, Virginia Beach leaders divided the Shore Drive project into four phases. The first, between Treasure Island and Marlin Bay drives, was completed in 2008.

The newest phase the city wants to fund is still a ways off from construction – it’s scheduled to start in 2023.

Hopefully, it can be done sooner, said Vice Mayor Louis Jones, who represents that part of the city.

The City Council will hold a workshop to discuss short term rentals on April 17, 2018.

Online Home Sharing Economy page at VBGov.com has been updated.

City Council held a discussion on short term rentals at their informal meeting on April 3. At this meeting, Vice Mayor Louis Jones distributed a draft ordinance he had prepared. The draft Ordinance . . .

“There are hereby established the following overlay districts: (1) Shore Drive Corridor Overlay District (“SD”)…”

View entire proposed Resolution. (19page PDF)

City Council Informal Session discussion April 3 ’18.

Baylines April Newsletter from BAC

Check out the entire Baylines April ’18 edition. (3 pg PDF)

The Bayfront Advisory Commission will hear a presentation on improvements to the Shore Drive corridor, including its history, current developments and plans for the future at its April 19 meeting 3:3-40-5 p.m. at thr Virginia Beach Resiort Hotel and Conference Center.David Jarman from the Public Works Department is scheduled to provide this update and overview, which is open to the public.

“It has taken decades of planning and a court case for the city to be ready to add sand to the rapidly eroding Chesapeake Beach. And crews could start work as soon as next month, if the city borrows $1 million set aside for beach replenishment at the Oceanfront.”

Article at Pilotonline.com:

It’s been eroding for years, said coastal manager Phill Roehrs, and the shrinking beach poses a threat to properties facing the Chesapeake Bay.

Photo Credit: Bill Tiernan The Virginian-Pilot

Help select our April Meeting Presentation by VB Economic Development

You’ve heard of blockchain and ICO?

Blockchain at Wikipedia:

A blockchain,[1][2][3] originally block chain,[4][5] is a continuously growing list of records, called blocks, which are linked and secured using cryptography.

ICO at Investopedia:

An Initial Coin Offering (ICO) is used by startups to bypass the rigorous and regulated capital-raising process required by venture capitalists or banks.

One recent example of a technology firm VB Econ Dev brought here.

We’ve heard our Virginia Beach Economic Development team is working with partners to create unique opportunities to create funding sources to help with 3 possible vital items for VB’s sustainable growth & preservation of our unique culture.

We’re trying to line up a presentation of how one example could work.

Choose one or add your own idea below.

SDCC Special Presentation Monday March 26th @ 7:30pm – Storm Water and Shore Drive Roadway Improvements East of Lesner Bridge

SDCC General Meeting Agenda
Monday March 26, 2018 from 7:30 to 9:00pm

Special Presentation – Storm Water and Shore Drive Roadway Improvements East of Lesner Bridge – Mr. Brad Vanderwarker and Mr. Mike Mundy, Public Works Engineers for the City of Virginia Beach, will discuss the City’s upcoming projects starting this Summer to help storm water/flooding issues between the Lesner Bridge and the State Park. They will also discuss the safety and beautification projects along Shore Drive that will start in August 2019. Brad and Mike will have project displays, handouts and will answer questions after their presentation.

You can click here to learn more about this topic.

SDCC General Meetings are open to all.  So if you care about Shore Drive and these upcoming changes, please attend and bring a friend.

#LESNERBRIDGE update: Nighttime and daytime lane closures planned for early next week.

From Wojo:

REMINDER:
Lane closures on Eastbound (EB) Shore Drive between Dinwiddie Road and East Stratford Street will be setup the EVENINGS of March 26 and March 27, 2018.

EB Shore Drive Lane Closure at East Stratford Street for March 26 thru March 27th 2018

Paving work is scheduled (weather permitting) for two nights beginning on Monday, March 26th and ending in the early morning hours of March 28th. Working hours for each evening will be from 7:00PM to 5:00AM. Therefore, beginning the evening of Monday, March 26th at approximately 7:00 PM, single lane closures will be setup on EB Shore Drive between Dinwiddie Road and East Stratford Street. EAST STRATFORD STREET WILL BE CLOSED AT SHORE DRIVE during each of these nights, so plan accordingly.

DAYTIME Lane closures on WB SHORE DRIVE AT PAGE AVENUE will also take place on March 26th, 2018. The RIGHT lane of WB Shore Drive will be closed at Page Avenue beginning at 9:00 AM on March 26th to allow the contractor to install the new traffic signal heads on the new mast arm. At some point during the day, the RIGHT lane will be re-opened and the lane closure moved to the LEFT lane to complete signal head installation. All daytime lane closures will be removed by 3:00 PM on March 26th. If additional work is needed to complete installation of the signal heads on this mast arm, the contractor will finish their work on Tuesday, March 27th utilizing a LEFT lane closure beginning at 9:00 AM on March 27th and ending some time before 3:00 PM that day.

WB Shore Drive Lane Closure at Page Avenue for March 26 thru March 27th 2018

Please Drive Carefully as you travel through this construction zone!

Thank You,
-Chris

SDCC General Meeting Monday March 26th at 7:30pm – Special Storm Water and Shore Drive Improvements Presentation

Click here for a printable version of the agenda 3.26.18 SDCC Agenda

SDCC General Meeting Agenda
Monday March 26, 2018 from 7:30 to 9:00pm
Ocean Park Volunteer Rescue Squad Hall
(parking in back, on side streets and across Shore Drive)

Special Presentation – Storm Water and Shore Drive Roadway Improvements East of Lesner Bridge – Mr. Brad Vanderwarker and Mr. Mike Mundy, Public Works Engineers for the City of Virginia Beach, will discuss the City’s upcoming projects starting this Summer to help storm water/flooding issues between the Lesner Bridge and the State Park. They will also discuss the safety and beautification projects along Shore Drive that will start in August 2019. Brad and Mike will have project displays, handouts and will answer questions after their presentation.

Officer’s Reports: Secretary – Andrew Broyles; Treasurer’s Report –Tim Solanic; Vice President – Wally Damon;
President – Todd Solomon

Bayfront Advisory Commission (BAC) News – Mr. Wally Damon will update us on the actions of the Bayfront Advisory Commission.

Old Business-

Addition of “Your Speed Is” Traffic Signs on Shore Drive – We are still waiting to receive City report. Mr. Robert Gey, City Engineer, will be sharing the results of their study performed at the end of 2017. SDCC will share this data and collect comments and questions at our March meeting to present to the City for response.

Short Term Rentals (STR) – City Council approved a 60 day deferral for the final vote on any STR policy at their March 20th meeting. Additional comments can be emailed directly to City Council at ctycncl@vbgov.com One Councilmember has also set up an online survey. Ms. Jessica Abbott’s survey can be found at https://form.jotform.com/jessicapabbott/short-term-rentals-survey

Shore Drive Road Improvements in Ocean Park – Update on Phase 4 – CIP 2.118. The City Manager has included a full funding request for this CIP in the proposed FY19 City Budget. In an effort to show support for this item and official SDCC vote will be taken at our March or April meeting. Please prepare accordingly.

New Business –

Recurrent Flooding and Comprehensive Sea Level Rise – Update on Deputy Manager Tom Leahy’s presentation to the Virginia Beach Council of Civic Organization and City’s plans for what happens next.

Community Concerns– Please share any issues or concerns your groups/organizations may have at this time.

***Next SDCC Meeting – Monday April 30, 2018***
Remember meetings are the LAST Monday of each month and April has 5

City of Virginia Beach to Hold Public Meeting About Flood Risks and Resiliency at Central Library – Sat. March 24th

The City of Virginia Beach, Public Works Engineering, and the Old Dominion University Resilience Collaborative will be sponsoring a film and interactive community event concerning flooding and ways to respond at the Virginia Beach Central Library on Saturday, March 24, 2018, starting at 1:30 p.m. At 2 pm, there will be a presentation of the film, “Tidewater: Water is Rising, Land is Sinking, and the Military is Here to Stay,” which was produced by Roger Sorkin and the American Resilience Project.

For more information on this event, please click the here

“When you adopt a storm drain through the City of Virginia Beach Adopt-a-Drain program, you are volunteering to keep your storm drain clear from debris, such as grass clippings, leaves, pine needles, sediment, and trash.”

Adopt-A-Drain interactive resource at drains.VBGov.com.

By taking care of your adopted storm drain, you’re helping to keep our local waterways clean and healthy.

ScnShotAdoptADrain

Wharf Permit Modification update including letter to DEQ & ACOE

Reposted from OPCL.org.

Wharf Permit Modification Letter 3-5-18 (3 page PDF)

Thanks to Mr. Roehrs for also providing the recent email discussion below:

From: “Phillip J. Roehrs”
To: Myles Pocta
Cc:
Bcc:
Date: Mon, 12 Mar 2018 14:31:52 +0000
Subject: RE: [Non-DoD Source] Lesner Bridge Replacement Project, Virginia Beach, Va NAO 2007-3405; VWP 12-1169
Please include Dan Adams. Thanks.

Phill Roehrs, P.E.
Water Resources Engineer
City of Virginia Beach
Public Works Engineering
757-385-8985

—–Original Message—–
From: Myles Pocta [mailto:mpocta@mapenvironmental.com]
Sent: Monday, March 12, 2018 10:31 AM
To: Phillip J. Roehrs ; Chris J. Wojtowicz
Cc: Danny B. Taylor ; David A. Bradshaw
Subject: RE: [Non-DoD Source] Lesner Bridge Replacement Project, Virginia Beach, Va NAO 2007-3405; VWP 12-1169

Phil,

Roger; will do and look to shore up for mid-to-late AM on 3/30 (Friday).
Also, be I’ll be checking with Clark-Nexsen on their availability to host mtg.

Lastly, Is there anyone else at the City you’d like to invite ?
After hearing from you and CN, I’ll send out email invite.

Thanks,

Myles A. Pocta, CEP. REM
President

MAP Environmental Inc.
116 Landmark Square, Suite 101
Virginia Beach, Virginia 23452
(757) 498-6131 phone
(757) 498-6132 fax
(757) 615-4929 cell
http://www.mapenvironmental.com

—–Original Message—–
From: Phillip J. Roehrs [mailto:PRoehrs@vbgov.com]
Sent: Monday, March 12, 2018 9:47 AM
To: Myles Pocta ; Chris J. Wojtowicz
Subject: RE: [Non-DoD Source] Lesner Bridge Replacement Project, Virginia Beach, Va NAO 2007-3405; VWP 12-1169

I can do the 30th. Sorry for the delay, I was off Wed-Fri, and forgot to post a notification.

Phill Roehrs, P.E.
Water Resources Engineer
City of Virginia Beach
Public Works Engineering
757-385-8985

—–Original Message—–
From: Myles Pocta [mailto:mpocta@mapenvironmental.com]
Sent: Thursday, March 8, 2018 2:18 PM
To: Chris J. Wojtowicz ; Phillip J. Roehrs
Subject: RE: [Non-DoD Source] Lesner Bridge Replacement Project, Virginia Beach, Va NAO 2007-3405; VWP 12-1169

Thanks Chris. Phil, how does the 30th look for you ?

Myles A. Pocta, CEP. REM
President

MAP Environmental Inc.
116 Landmark Square, Suite 101
Virginia Beach, Virginia 23452
(757) 498-6131 phone
(757) 498-6132 fax
(757) 615-4929 cell
http://www.mapenvironmental.com

—–Original Message—–
From: Chris J. Wojtowicz [mailto:CWojtowi@vbgov.com]
Sent: Thursday, March 8, 2018 11:26 AM
To: Myles Pocta ; Phillip J. Roehrs
Subject: RE: [Non-DoD Source] Lesner Bridge Replacement Project, Virginia Beach, Va NAO 2007-3405; VWP 12-1169

Myles,

March 30th is Good Friday and I will be taking both the 29th and the 30th off.

-Chris

—–Original Message—–
From: Myles Pocta [mailto:mpocta@mapenvironmental.com]
Sent: Thursday, March 8, 2018 10:23 AM
To: Phillip J. Roehrs ; Chris J. Wojtowicz
Subject: RE: [Non-DoD Source] Lesner Bridge Replacement Project, Virginia Beach, Va NAO 2007-3405; VWP 12-1169

Good morning Phil,

After Tuesday’s email, Scharlene Floyd (COE) called to briefly talk about the extension/modification.
She thinks a meeting (w/her and Sheri, DEQ) has merit and suggested later this month at Clark Nexsen.

We think its wise to meet and include the following attendees: you, Chris W, Dave, Danny, COE (Scharlene & Greg Steele (?)) and the DEQ.
In terms of venue/date, we suggest mtg. at Clark Nexsen the last week of March (both the COE and DEQ are open Friday, March 30).

Are you amenable & does March 30th work or do we need another date for you ?

Please advise if you want me to canvass others and/or send an email invite ?

Thanks,

Myles A. Pocta, CEP. REM
President

MAP Environmental Inc.
116 Landmark Square, Suite 101
Virginia Beach, Virginia 23452
(757) 498-6131 phone
(757) 498-6132 fax
(757) 615-4929 cell
http://www.mapenvironmental.com

—–Original Message—–
From: Floyd, Scharlene A CIV USARMY CENAO (US) [mailto:Scharlene.A.Floyd@usace.army.mil]
Sent: Tuesday, March 6, 2018 10:45 AM
To: Myles Pocta
Subject: RE: [Non-DoD Source] Lesner Bridge Replacement Project, Virginia Beach, Va NAO 2007-3405; VWP 12-1169

After our phone discussion, would it not make sense to have a meeting to discuss this proposal after our discussion about Elbow Road? Thanks, S

—–Original Message—–
From: Myles Pocta [mailto:mpocta@mapenvironmental.com]
Sent: Tuesday, March 6, 2018 9:19 AM
To: Floyd, Scharlene A CIV USARMY CENAO (US) ; Kattan, Sheri (DEQ) ; Worrell, Justin (MRC)
Cc: Chris J. Wojtowicz ; Phillip J. Roehrs ; David A. Bradshaw ; Danny B.
Taylor ; Kelly Waldrop ; Mack Frost ; Hal Pitts ; Joe Wallenfelsz
Subject: [Non-DoD Source] Lesner Bridge Replacement Project, Virginia Beach, Va NAO 2007-3405; VWP 12-1169

Good morning Scharlene and Sheri,

As recently discussed, please see the attached letter requesting an extension and modification to the City’s existing permits.

Please review and advise if you require additional information or wish to meet and discuss.

We appreciate your review and look forward to working with you.

Sincerely,

Myles A. Pocta, CEP. REM

President

MAP Environmental Inc.

116 Landmark Square, Suite 101

Virginia Beach, Virginia 23452

(757) 498-6131 phone

(757) 498-6132 fax

(757) 615-4929 cell

http://www.mapenvironmental.com

———- Forwarded message ———-
From: “Chris J. Wojtowicz”
To: Daniel Adams
Cc: “Phillip J. Roehrs”
Bcc:
Date: Tue, 9 Jan 2018 18:43:31 +0000
Subject: RE: Council Briefings
Dan,

The cost was $1,138,799.24 to construct and was designed by Clark-Nexsen (A&E)

There is also a line item to remove this wharf in the amount of $32,142.47

There is about 753,000 lbs. of salvageable sheet pile in the temporary wharf. At $0.20/lb of scrap value that would equate to $150,600.

So, we expect a change order to be approximately ($150,600-$32,142) $118,000.

Thanks,
-Chris

From: Daniel Adams
Sent: Tuesday, January 9, 2018 9:31 AM
To: Chris J. Wojtowicz
Cc: Phillip J. Roehrs
Subject: FW: Council Briefings
Importance: High

Chris,

Need some cost information and history on the wharf.

What was the cost to construct?

What is the estimated cost for it to remain? (assume we are due a credit for removal labor and disposal cost minus any salvage value)

Was the facility designed by the project A/E or did the contractor design it based on their operational needs and equipment?

That is all.

Thanks,

Dan

From: Tom Leahy
Sent: Monday, January 8, 2018 5:54 PM
To: Mark A. Johnson
Cc: Tonia P. Alger ; Greg Johnson ; Shanda H. Davenport ; Charles Bodnar ; Bradley W Vanderwarker ; Phillip J. Roehrs ; Daniel Adams ; Shandra L. Cummings
Subject: Council Briefings

Stormwater was scheduled to provide a briefing on Ashville on January 16. That has been cancelled pending the development of more details of the cost sharing with HomeFed. However, please start roughing a presentation out. We may have to do it on February 6.

In its place on January 16, Coastal will provide a briefing on the Lesner Municipal Wharf. Dave does want some cost information about how much this cost us to construct, and how much it will cost us to make it permanent.

The Central Beach District Briefing will have to occur on February 6 because that is the day that Dave is taking the ordinance to City Council. I will discuss with him February 20, but don’t count on that. I will help work on this presentation. We will need to address the issues raised the last time we tried this. My notes of the November 21, 2017 Council meeting are included below:

Thanks,
Tom

———- Forwarded message ———-
From: “Steele, Gregory C CIV USARMY CENAO (US)”
To: “Phillip J. Roehrs”
Cc:
Bcc:
Date: Tue, 6 Mar 2018 14:44:20 +0000
Subject: RE: Lesner Municipal Wharf
Thanks, Phill!

Gregory C. Steele, P.E., WRCP
Chief, Water Resources Division
Norfolk District, U.S. Army Corps of Engineers
803 Front Street
Norfolk, VA 23510

(757) 201-7764 office
(757) 805-4259 cell

Gregory.C.Steele@usace.army.mil

—–Original Message—–
From: Phillip J. Roehrs [mailto:PRoehrs@vbgov.com]
Sent: Tuesday, March 06, 2018 9:21 AM
To: Steele, Gregory C CIV USARMY CENAO (US)
Subject: [Non-DoD Source] Lesner Municipal Wharf

Greg,

Thanks for meeting with me Friday. Here’s the letter regarding the wharf, just sent this morning.

Phill Roehrs, P.E.

Water Resources Engineer

City of Virginia Beach

Public Works Engineering

757-385-8985

Have questions about work on Shore Drive & storm water on east side of Lesner ? Join us March 26th!

Thanks to Mr. Vanderwarker for answering a few questions from our meeting last week:

Gentlemen,
Here are a few follow-up answers for questions you had on Friday.

· SAND DUNES and SHORE DR. FLOODING FALL 2016
Mr. Damon, your observations are correct. Cape Henry Beach historically had a wider taller dune field and was a “stable” to “accretional” beach for many years. Historically the toe of dune and shoreline position have been slowly advancing bayward over time.

CIP 8-020 Bay Beaches Resiliency was established in the FY 18 CIP to study and address erosion along Cape Henry and Ocean Park beaches. We are in the early study phase. This projects initiates the preliminary planning, design, and permitting framework necessary for instituting a beach management program for Cape Henry and Ocean Park beaches. The project will determine the required beach profile to provide protection to upland structures, apply for State and Federal permits, and development of a funding strategy for a long-term erosion control and storm protection project.

Regarding the lag effect of groundwater that percolated and inundated some parts of Shore Drive in the Fall of ’16; for a storm of this magnitude, we believe there is little to no correlation between the dune erosion and rainfall flooding. Keep in mind that Tropical Storm Hermine and Tropical Storm Julia supersaturated the soils prior to Hurricane Matthew’s arrival just two weeks after Julia. We understand that neither Isabel nor Nor’Ida (Nor’ida having the largest tidal inundation we’ve seen) were as bad as Matthew for this condition. Citizens have also reported the upward movement of groundwater even over at Cape Story By the Sea at the lower elevation properties (3.5 to 4), as there are adjacent higher properties near 10.0. See attached.

If you have any further questions, please direct them to Mr. Dan Adams, Office 757-385-4783 or DAdams@vbgov.com.

· SHORE DRIVE CITY WEBSITE
Yesterday I provided the Project Manager’s name, Mr. Bill Purcell, (757) 385-4887, WPurcell@vbgov.com if you wish to publish just the plan sheets to the website.

· SHORE DRIVE PH III DRAINAGE NEAR THE ROW LINES
For our meeting with the SDCC March 26th, I will bring you a few Shore Dr. PH III plan sheets and cross sections to show how the project handled drainage near the roadway toe of fill areas, and how either supplemental drainage structures were provided or small ditch systems. (Emphasis ours.)

· NEW DITCH TECHNOLOGIES – NEW PRODUCTS TO ENCOURAGE GREEN BUT BE MAINTENANCE FRIENDLY
Ditches will always need maintenance, as sedimentation is a foregone conclusion… But to fulfill both objectives above is very tough… a concrete lined channel may (not always) be easier to maintain for cleaning, but they are not green. If they break up or deteriorate though, a stream restoration project is usually needed to mitigate.

While natural ditches are green, and can grow vegetation, but in this coastal environment they can try to turn into a wetland area.

While some proprietary products are “hybrid” ditches that allow growth “through” concrete blocks and have a protective lining, sediment still has to be removed. During maintenance operations, the danger is that some of the excavator’s bucket “teeth” can grab the material, thus pulling it up, which can be a nightmare since the mats are overlapped (shingled).

PW OPERATIONS did not have new technology solutions that would fit your request.

· ACCEL/DECEL LANE NEAR WESTMINSTER CANTERBURY
There is a proposed dedicated 150’ right turn storage lane with a 150’ taper transition into the Westminster Canterbury site…beyond that entrance, there is continuous accel/decel lane all the way down to Kleen St.

Best Regards,

Brad

Bradley W. Vanderwarker, P.E.
Project Manager

City of Virginia Beach
PW/Stormwater Eng. Center
2405 Courthouse Drive, Suite 353
Virginia Beach, VA 23456
(757) 385-4131 (main)
(757) 385-8556 (direct)
bvanderwarker@vbgov.com