City Manager Update #7 – Schools closed Monday and more

From an email:

This morning’s 1000 City Manager’s update on Hurricane Sandy’s observed and projected impacts to Virginia Beach remain reasonably consistent with our last two updates.

Our most significant issue remains tidal stacking within the Lynnhaven and Elizabeth River basins creating a high risk for low level residential flooding. This morning’s high tide within the Lynnhaven was as predicted @ 2 -2 ½ feet above normal. We observed road inundation in many of the waterfront low lying areas within the Lynnhaven and Rudee basins. We will be closely monitoring the endangered neighborhoods and we are continuing our use of Reverse 911 VB Alert system to notify residents of the risk in those specific neighborhoods. The results of these efforts are being posted on our Hurricane Sandy webpage. Staff continues developing Sandy specific inundation maps to better identify impacts. The number of above high/low tide cycles stacking within the Lynnhaven, Elizabeth and Rudee basin leads us to project that properties whose elevation is below 6 feet above sea level are at great risk to tidal inundation. We remain confident the Historical Tidal & Surge Chart is projecting where Sandy’s high tide elevations above Mean Low Water Level will be in relation to our previous storms. This additional information is being posted on our VBgov website.

Sustained wind projections have increased slightly but still will not reach hurricane force and sustained tropical force winds (39-74mph) may be reached. We do however anticipate tropical force gusts that may occasionally reach 60 mph. As the storm remains offshore and is hooking around VB we will begin to experience consistent wind this afternoon. The extended severity of this nor’eastercane will set in early this afternoon and remain consistent thru tomorrow afternoon. Dom Power reported customer outages has grown to 2500.

Storm surge poses our third threat. Atlantic wave height projection has grown to +15 feet; Bay wave height has grown to 9 feet. Beach erosion will definitely be significant. This morning’s waves on high tide lapped at the base of the Grommet Park berm.

Rain is our 4th threat. Some areas of the City may receive up to 7 inches. This is a slight increase in the projection. Surface ponding will occur as runoff will be hindered due to elevated levels of the Lynnhaven, Elizabeth and North Landing Rivers. Back Bay is seeing significant low levels based on the northerly winds pushing the water south and out to the Currituck. Storm water crews are responding to ponding issues. The police are bringing in additional assets to assist in high water traffic control. We are working on a reporting tool to post this data on the Hurricane Sandy webpage

Duration of Sandy continues to make this storm a significant event. Weather conditions continue to deteriorate and stretch into the new work week. The most intense period of the storm has lengthened and is projected to be Sunday afternoon thru Tuesday early morning. During this intense period will see sustained winds just touching the threshold for tropical storms.

Decisions made at this morning’s meeting:

· The Birdneck ES shelter opened on time this morning at 10AM.

· The EOC will operate under a partial activation effective 1200 (noon) today.

· City services and staffing will operate under essential conditions beginning 0600 Monday until further notice.

· VB Public Schools have just notified the EOC they will be closed Monday.

· The next City Manager staff update is 5PM today.

Will keep you advised. Dave

Emphasis ours.

20121028-133910.jpg
Boat Ramp high tide #1 this morning.

20121028-134010.jpg
Boat Ramp low tide #1

(Note: the tide photos were not necessarily taken at peak hi and peak lo)

“Hurricane Sandy Update Sunday, October 28, 2012, 11:00 a.m. The duration of Sandy continues to make this storm a significant event. Deteriorating weather conditions will stretch into the new work week, impacting the City through Tuesday evening. The most intense period of the storm has lengthened and is projected to be Sunday afternoon through Monday evening.”

SANDY UPDATE AT VBGOV.COM

20121028-121827.jpg

” The number of high/low tide cycles is now more comparable to the number and elevation we experienced in the 2006 Thanksgiving Nor’easter.”

From an email to Empsy from Council Jim Wood:

Subject: Nor’eastercane SANDY Update #5
The 0900 City Manager and 1000 VDEM updates have revealed Sandy’s impacts to Virginia Beach have slipped further into the start of this coming work week. We are predicting on Monday the City will still be experiencing significant effects of the nor’eastercane which may last into Tuesday. The second significant change we have deduced is that the storm tide impacts projection has lessened slightly. We have attached this morning’s briefing charts.(Editors note: I did not receive these briefing charts as of the time of this post.) Addressing the 5 key parameters, here is the latest:

1. Most significant issue remains tidal stacking within the Lynnhaven basin. High risk to low level residential flooding . We will be closely monitoring the endangered neighborhoods and at this time have not issued any evacuation directives. Staff is developing a Sandy specific inundation map utilizing current projections applied to the Corps of Engineers Surge Data map for a Cat 1 storm. The number of high/low tide cycles is now more comparable to the number and elevation we experienced in the 2006 Thanksgiving Nor’easter. We have used the Historical Tidal & Surge Chart to indicate where Sandy’s high tide elevations above Mean Low Water Level will be. We expect to be able to issue specific neighborhood flood warnings Sunday morning.

2. Sustained wind, is still not expected to reach hurricane force (only a 3% chance) and sustained tropical force winds are not expected either (a 9% chance). We do however anticipate tropical force gusts (+35% chance). As the storm remains offshore and is hooking around VB we will begin to experience consistent wind Sunday morning and expect it to last for over 62 hours into Tuesday. This lengthy duration will surely cause tree and debris knock down which in turn will cause power outages. Dominion’s weather advisory of 10:47AM this morning is attached. No change to their amber rating here in Tidewater. Currently 1800 customers are without power in VB.

3. Storm surge poses our third threat. Atlantic wave height projection has grown to +15 feet; Bay wave height has grown to 9 feet. Beach erosion will definitely be significant.

4. Rain is our 4th threat. Some areas of the City may receive up to 6 inches. Surface ponding will occur as runoff will be hindered due to elevated levels of the Lynnhaven, Elizabeth and North Landing Rivers, Back Bay and the many lakes and ponds throughout the City. The intensity projections of the rain may be lessening towards a more consistent downfall for a longer period.

5. Duration of Sandy continues to make this storm a significant event. Weather conditions will deteriorate later than first predicted and stretch into the new work week. Deteriorating conditions will begin after midnight tonight and impact the City thru Tuesday evening. The most intense period of the storm has lengthened and is projected to be Sunday afternoon thru Monday evening. During this intense period will see sustained wind of +30mph for nearly 30 hours. (30/30 effect)

Decisions we are assessing are: Public Schools for Monday, Shelter openings, EOC activation and City operational status for Monday. VBCPS, DHS and the Sherriff Office have been issued an internal warning order to plan/prepare for possible opening the Birdneck ES shelter Sunday morning. The next City Manager staff update is 1500 this afternoon. City staff continues to function under a normal operation status. The EOC is currently operating with EOC staff only except for staff updates. The ECCS 311 staff shifts to 24 hour operations effective 0700 Sunday morning. Current call volume is down and the frequently asked inquiries are: absentee voting and sheltering. Current closings for Sunday include: the Virginia Aquarium and Science Center and the Historic Houses. The VB Visitors Centers at First Landing State Park and the Chesapeake Bay Bridge Tunnel Center will be closed on Sunday and Monday. Decisions on libraries and rec centers will occur following the 1500 update. US Dept of Homeland Security Advisor Milicich is participating in our staff analysis process. Will keep you advised.

Emphasis ours.

“The 5 key parameters are: 1. Most significant issue remains tidal stacking within the Lynnhaven basin. High risk to low level residential flooding . We will be closely monitoring the endangered neighborhoods and at this time have not issued any evacuation directives. The number of high/low tide cycles looks to rival the number we experienced in the 2009 Nor’easter.”

From an email to Empsy from Councilman Bill Desteph:

Subject: Hurricane Sandy Update #4

Empsy,

FYI.
At the City Manager’s afternoon update staff reviewed the current conditions and projections of Hurricane Sandy (see attached)(19pg PDF). We are not registering any significant changes to the projections we summarized in our morning update #3. The 5 key parameters are:
1. Most significant issue remains tidal stacking within the Lynnhaven basin. High risk to low level residential flooding . We will be closely monitoring the endangered neighborhoods and at this time have not issued any evacuation directives. The number of high/low tide cycles looks to rival the number we experienced in the 2009 Nor’easter.
2. Sustained wind, though not expected to reach hurricane force, will gust to a tropical storm level, will last for over 48 hours. Tree and debris knock down will cause power outages. We participated in Dominions conference call and I personally talked with their senior manager, Max Bartholomew.
3. Storm (tidal) surge poses our third threat. Atlantic wave height projection has grown to +12 feet; Bay wave height has grown to 8 feet. Beach erosion will likely be significant. Beach replenishment projects scheduled for the oceanfront scheduled to commence next month are quite timely. We’ll need to make a critical assessment of the Bay beaches and develop protection strategies.
4. Rain possess a 4th threat to our citizens and property. Some areas of the City may receive up to 6 inches. Surface ponding will occur as runoff will be hindered due to elevated levels of the Lynnhaven, Elizabeth and North Landing Rivers, Back Bay and the many lakes and ponds throughout the City.
5. Duration is what is making this storm a significant event. Weather conditions will deteriorate on Saturday afternoon and impact the City thru Tuesday. The height of the storm is projected to be Sunday afternoon till early Monday afternoon.

Facility closings will be announced beginning tomorrow. Most will be open tomorrow as scheduled, but we are not anticipating opening other than essential facilities on Sunday. Mondays conditions will be further refined on Sunday for determining what openings/closing will occur at the start of the new work week. At this time we do not anticipate the need for opening any public shelters. VB Public Schools briefed their preparedness to open Birdneck ES if needed. Sherriff Stolle advised his deputies are prepared to support where needed. The Registrar’s Office will be open tomorrow and closed Sunday. The Virginia Beach EOC will be partially activated on Saturday for updates scheduled for 0900 and 1500.

Grommet Park’s berm was completed midday today. Public Utility generators have been readied to back up our pump stations. The beach stage canopies have been removed as have been the wooden handicap ramps and trashcans on the sand. The Blue Moon Wicked 10K Run at the ocean front will be held on Saturday as planned. The post-race party has moved from the beach to the convention center. Sunday afternoon’s Virginia Symphony concert is under review. We continue to issue press releases, update information on our website and our social media sites. We’ll keep you advised.

Emphasis ours.

COASTAL FLOOD WATCH
COASTAL HAZARD MESSAGE
NATIONAL WEATHER SERVICE WAKEFIELD VA
751 AM EDT SAT OCT 27 2012

* TIMING…TODAY THROUGH MONDAY FOR THE HIGH SURF. FOR TIDAL
FLOODING…SUNDAY MORNING THROUGH MONDAY EVENING…WITH THE
GREATEST IMPACT AND WATER LEVELS LIKELY TO OCCUR WITH THE MONDAY
MORNING HIGH TIDE CYCLE.

* IMPACTS…WATER LEVELS ARE EXPECTED TO RISE TO 2 TO 4 FEET
ABOVE NORMAL BY THE SUNDAY MORNING TIDE CYCLE…AND CONTINUE
THROUGH THE MONDAY EVENING TIDE CYCLE. MODERATE TO POSSIBLY
SEVERE FLOODING WILL BE POSSIBLE WITHIN A FEW HOURS EITHER
SIDE OF EACH HIGH TIDE.

” As what happened in the 2009’ Nor’easter, Virginia Beach will undergo significant tidal stacking within the Lynnhaven Basin. We expect continuous northerly winds to not allow low tide cycles to empty the basin as they normally should. Just as in 2009 we are predicting as many as 6 high/low tide cycles to be held captive within the Lynnhaven Basin.”

SANDY UPDATE FROM VBGOV.COM

Hurricane Sandy Information

The City and the Bayfront Advisory Committee has provided the following helpful documents regarding the potential impact of Hurricane Sandy to our area.

NOAA Briefing Overview with helpful weblinks – Click here to read the overview NWSWakefield_SandyBriefing_Oct25

Storm Surge – Surge potential of 2-3 feet will combine with astronomically high tides resulting in moderate coastal flooding. Highest potential for moderate flooding is along the entire coast and lower Bay (including Hampton Roads) Sun/Mon.

Dominion Weather Statement – the item to note in this statement is the predicted storm surge for the Sunday morning and evening tides. The past noreasters were surges of 8 feet plus. Click here to read the statement DWxC_Statement_-_20121025_1024

High tides near the mouth of the Bay will peak between roughly three and four feet, while in the Outer Banks Atlantic tides will peak between roughly four and five feet.

SDCC General Meeting – Monday Oct. 29 at 7:30pm

SDCC Agenda OCT 2012

 

Shore Drive Community Coalition

Monday 29 OCT 2012

SDCC General Meeting

SDCC General Meeting – Monday, 29 October  7:30 – 9:00 pm

Ocean Park Volunteer Rescue Squad Station (Intersection of Shore Drive and East Stratford Rd.)

 

Call to order

Meeting topic:          Discussion of proposed Constitutional Amendments; Eminent Domain, and Revised Assembly Schedule; and Advisory Referendum on the Tide Light Rail

www.SDCC.info  

www.longcreekwetlands.com

www.VBGov.com

 Officers’ Reports

                                    President’s Report              David Williams

                                    Vice President’s report      Grace Moran

                                    Secretary’s Report             Todd Solomon –Sept Minutes

                                   Treasurer’s Report             Carol Collins

 

Update on issues:    Open questions from the floor

 Old Business Nominations for Officers for SDCC Executive Board

 New Business          

 Adjourn

 

Next SDCC- Monday November 26, 2012

Ocean Park Volunteer Rescue Squad Center

Speaker- TBA

 

Please check www.sdcc.info for more information on area news and events

New electronic billboard for 7 story fast food place going up at Greenwell.

Just kidding.

The sign that just popped up supported by the large silver pole instead of a black pole is part of the Virginia Beach Dynamic Message Signs and System Detector Project. The construction at Greenwell and Shore Drive is for the new LEED certified Fire Station.

Virginia Beach Dynamic Message Signs and System Detector Project

An email about the electronic signs:

The Virginia Beach Dynamic Message Signs and System Detector Project will consist of the installation of 11 motorists advisory Dynamic Message Signs (DMS), overhead sign support structures, equipment cabinets, and communication equipment. The DMS’s will have three line displays. Each line will consist of 12 inch height, LED (Light Emitting Diode) characters. The DMS’s will be installed at eight locations within the City. The DMS’s will be installed at the following locations:

1. Princess Anne Rd and Elson Green Ave, southbound
2. General Booth Blvd at the KOA Campground, northbound
3. Shore Dr and First Landing State Park, westbound
4. Shore Dr and Bayville Rd, back to back DMS’s – photo above
5. Northampton Blvd and Bayside Rd, eastbound
6. Northampton Blvd and Shell Rd, westbound
7. Independence Blvd and Wakefield Dr, back to back DMS’s
8. Shore Dr near 83rd St, back to back DMS’s

The project will also include the installation of two types of vehicle detectors. The vehicle detectors will consist of wireless transmitters, and micro loop sensors. The detectors will be installed at 46 locations within the City. Vehicle detector communication equipment will be installed in the existing traffic signal cabinets. There will also be the installation of one CCTV camera on this project. All of the project equipment will be configured to communicate with the City of Virginia Beach Traffic Management Center.

The DMS’s will convey traffic condition information to the roadway motorists. The vehicle detectors will be capable of instantaneously detecting changes in traffic flow patterns. With the construction of this project, the Traffic Management Center will add to its capability of facilitating the application of technology and engineering, to managing traffic, and disseminating traffic related information to the motoring public.

Meeting, February 9, 2012

A Pre-Construction Meeting was held for the stakeholders of the above mentioned construction project. Construction on this project will commence during the spring of this year. The construction team members of this project included;

1. Midasco, specialty infrastructure contractor, the primary Contractor
2. MBP, a construction and program management firm, the lead inspection team
3. URS, lead engineering design firm
4. Public Works/ Traffic Engineering, inspection and traffic control
5. Public Works/ Construction Engineering, inspection
6. Traffic Management Center

The Virginia Beach Dynamic Message Signs and System Detector Project, CIP 2-039 (Capital Improvement Program), completed its bid opening on October 27, 2011. The Engineers Estimate for the Project was $2.616 million. The bidding was won by Midasco, for $1,616,616.

By the way, stakeholders on Shore Drive were apparently told once about this project a couple years ago. No one remembers being invited to the February 2012 meeting mentioned above.

Here is the Official CIP Project Page for the new LEED certified Fire Station.

This project replaces the existing 9,760 square foot facility supporting 4 Fire and 2-to-5 Emergency Medical Services (EMS) personnel, 1 fire engine and 1 ambulance on a daily basis, and various other pieces of equipment that are infrequently used (ranging from fire trucks to zodiac boats).

Todd has been trying to get architectural drawings of the new facility to share.

Update on new Lesner Bridge public notices for required permits

From an email:

Sent: Fri, Oct 19, 2012 10:01 am
Subject: Lesner Update

Kal,
Just wanted to make you and the BAC aware of a few things that are occurring with the Lesner Bridge Project.

Public Notices for Permitting

The Corps of Engineers, DEQ, VMRC, and Coast Guard are advertising public notices for the construction permit on this project. The Corps of Engineers public notice has already been advertised and can be found at: http://www.nao.usace.army.mil/Media/PublicNotices.aspx

We know there has been some concern about the City putting in a bulkhead at the boat ramp site. We just want the BAC and the Shore Drive community to understand that the current public notices are for the construction of the Lesner Bridge only. This will include a temporary bulkhead at the boat ramp. Any effort made to change the scope of the construction permit (e.g., make the temporary bulkhead permanent) will require a separate application and approval from the permitting agencies. We want to be clear with the BAC and the Shore Drive community that this current application is only for the construction needs of the bridge project. This is consistent with the approach that we discussed with the BAC and the SDCC in early 2012.

Drilled Shaft Load Test at the Boat Ramp

Our design team is currently mobilizing a contractor to perform a drilled shaft load test. This effort will consist of drilling a 4’ diameter hole approximately 110’ deep, placing reinforcing steel, and backfilling with concrete. Once the concrete has cured, the contractor will jack against the drilled shaft until it fails. This test will give us actual field information about how well the drilled shaft will perform. With this information, we can finish the foundation design for the bridge using the most economical drilled shaft design. You will likely see the contractor on site starting next week. We just wanted to make you aware of this in case there are any questions from the community.

Project Manager Change

Chris Wojtowicz is taking over this project for Toni Alger. Toni is still in our group, however she was selected for a supervisor position and her duties have expanded beyond managing projects. Chris is getting up to speed and will be taking care of the day to day responsibilities. Chris has been doing a great job managing the Laskin Gateway project and will bring a lot of experience to the table as we get closer to construction. I will still be involved and available for questions as well so we will have continuity during this transition.

If you have any other questions or concerns, please let us know.

David S. Jarman, P.E.
Transportation Project Management Supervisor
Department of Public Works
City of Virginia Beach
757-385-4144 (direct)
757-385-4131 (main)

Cape Story Oyster Roast – Sunday Nov. 4th from 2:00pm to 5:00pm at O’Leary’s

Lots of food and drink.  $30 advance tickets.  $40 at the door.

Click here for the flyer and additional information.  CSBTS 2012 Oyster Roast

Shellfish Company Fall Fest – Sat. Oct. 20th from 1-4pm (Proceeds benefit LRNow)

Shellfish Company Fall Fest (Proceeds benefit LRNow)

Shellfish Company Fall Fest
Saturday, October 20, 1-4 PM  at 3323 Shore Drive, Shellfish Company

Portion of Proceeds donated to LRNow 

Get together with friends and family and join us for a party on the deck overlooking the Lynnhaven River.  Live entertainment, door prizes, roasted oysters, Carolina BBQ, steamed shrimp, beer and more!

Tickets are $25 in advance.  Tickets are limited, so get them early!  Tickets are available at Bubba’s, Shellfish Company and The Back Deck. 

BAC Meeting Notice and Newsletter – Thursday Oct. 18th

Click here for the Bayfront Advisory Committee Newsletter VisionNewsletter 2 10

 

Bayfront Advisory Committee to Meet October 18

The Bayfront Advisory Committee will meet Thursday, October 18, at the VIRGINIA BEACH RESORT AND CONFERENCE CENTER, Lynnhaven Room, 2800 Shore Drive, from 3:30pm-5:30pm. 

The agenda for the meeting will include the following: 

Update on public and private projects in the Bayfront area.

Update on committee activities in the Bayfront area.

 

 Bayfront Advisory Subcommittees

 The Bayfront Advisory Subcommittees will meet Thursday, October 18, at the VIRGINIA BEACH RESORT AND CONFERENCE CENTER, Lynnhaven Room, 2800 Shore Drive, from 2:00pm-3:15pm.  The subcommittees will continue their deliberations regarding recommendations for commercial design standards along the Shore Drive corridor, communication with the public, and citizen safety in the corridor.

First Landing State Park Fall Fest – Sat. Oct. 20th, 2pm to 6pm

Fall_Fest_flyer_2012

Dear Shore Drive Residents,

Our Annual Fall Fest at First Landing State Park is Saturday, October 20th from 2:00 pm – 6:00 pm and I would like to invite you to participate as a volunteer. I have attached a flyer. Please feel free to forward the flyer to your family and friends!

If you have any questions, please let me know!

Thanks!
Kim Y. Miller
Volunteer and Events Coordinator
First Landing State Park
2500 Shore Drive
Virginia Beach, VA 23451
Phone: 757-412-2308
Fax: 757-412-2315
Cell: 757-536-0088

Your Civic Organization and YOU

As you know, there are many civic organizations in Virginia Beach. Of the many, how are  Shore Drive Community Coalition(SDCC), Virginia Beach Council of Civic Organization (VBCCO), and Bayfront Advisory Council (BAC) similar or are they different ? These three organizations were formed to address different issues at the time that were not being adequately resolved at the city level. By providing a collective and representative voice for their group,these organizations sought to be heard by the City Council or the staff that serve the Mayor and Council.  What am I trying to point out?

We, Shore Drive Community Coalition are only as effective as our collective efforts at trying to provide a common voice to the issues that impact our Shore Drive community. Many of us have spoken before VB City Council to present our group’s support or concerns on important issues. This is democracy in a republic. Sometimes we have achieved our objective, while other times we may feel as if we have been  ignored by our elected officials. But, while immediate change usually does not happen, I think civic organizations can bring about change.  Look at the change that has come about with civic involvement.  Ask yourself if change would have occurred if no one spoke?  Obviously change comes from participation in the government process.

The Mayor and City Council have acknowledged and most positively responded to our concerns on “Shore Drive 35 Alive” , needed bike paths, and most spectacularly with Pleasure House Point. These excellent achievements would not have been possible without citizen participation and involvement that was recognized at the City government level.

There are many more major issues that our city is facing or will be facing in the near future.  Our city faces major budget deficits in the next five years that will impact all of us. Some estimates indicate that it will reach $500 million dollars unless additional revenues are found.  Translate that to mean higher taxes from us all.  How our city’s projected deficit will impact the Light Rail question, Sports Arena, Neighborhood Dredging Program, our schools and teachers, libraries, and police and fire staffing levels will all have to be discussed.  We can just listen to our city experts, or we can do our own homework and then work with our civic organizations. Our citizens’ positions should be heard. How does that happen?  More residents will have to step forward and get involved.  More residents need to participate in our city’s civic organizations. Civic organizations are only as effective as their membership.  Get involved.  Come and hear your City Council candidates speak on the 17th at Cape Henry Collegiate 7-9pm.  Come to Shore Drive Community Coalition meeting, 29 OCT 7:30-9:00 at the Ocean Park Volunteer Rescue Squad . If you want the city to listen, sometimes you have to speak with a combined voice.  Change does not occur in a vacuum.  See you there.

What: Virginia Beach Mayoral and City Council Candidates’ Forum. When: Wednesday, October 17th, 7-9 PM, doors open at 6:30. Where: Cape Henry Collegiate School Dreyfus Auditorium, 1320 Mill Dam Road, Virginia Beach.

Sponsors: Lynnhaven River NOW, Council of Garden Clubs, Shore Drive Community Coalition, Back Bay Restoration Foundation, Princess Anne Garden Club, and the Virginia Beach Garden Club
Free and open to the public. No pre-registration required.

BE INFORMED

Ocean Park Fall Festival and Art Show – Saturday October 6th from 10am to 5pm

The 2012 Ocean Park Fall Festival and Art Show is
 

October 6th from 10:00 am to 5:00 pm.

The Festival is sponsored by and benefits the Ocean Park Volunteer Rescue Squad.

 
The event is an effort to bring residents together for a day of fun with the added benefit of raising awareness of issues to the local community and various neighborhoods along Shore Drive.
 
The Fall Festival will feature an outdoor art show, live entertainment, a craft show inside the Rescue Squad building, children’s activities, a Bounce House, displays of Rescue Squad equipment, and a fully restored vintage Virginia Beach Ambulance.
 
Located along Shore Drive, the venue includes Rescue One, Lynnhaven Marine and Capt. Max King’s (formerly Browning’s Marine). Local residents are encouraged to walk to the event, however there is parking at Max Kings, Lynnhaven Marine and neighborhood streets.
 
Three live performances beginning at 10:00 am, featuring entertainment by Stan Howard aka The Sax Man, Joe Maniscalco and Grant Austin Taylor.
 
The event organizers hope to make this an annual event that raises funds to support the Rescue Squad. This is also an opportunity to chat with members of local groups that volunteer their time to enhance the community. Many of our residents are members of The Shore Drive Community Coalition, Bayfront Advisory Committee, Lynnhaven River Now, Pleasure House Point and the  Chesapeake Bay Foundation. Mark your calendar now that, plan to spend a few hours or  the entire day with free entertainment, discussion of important local issues, and having some fun with your neighbors!
 
For more information, if you would like to volunteer, or if you want to participate in the art show or craft show, please call 468-1193.

New SDCC Agenda with John Moss as Special Guest Speaker

Come out and hear Councilman John Moss talk about the City’s proposed projects (Light Rail and NBA Stadium) and the City’s budget along with other issues.

Click here to print the new agenda  SDCC SEP 2012 Agenda

Councilman Moss To Speak at 25 SEP SDCC Meeting

SDCC members have an opportunity to hear VB Councilman John Moss speak before our gathering this Tuesday 25 SEPT at 7:30. The meeting will be held at our usual location, Ocean Park Volunteer Rescue Squad Station (Intersection of Shore Drive and East Stratford Rd.). Please note that the normal meeting date (the last Monday of the month) has been changed for this September meeting to avoid conflicting with the VBCCO City Council Candidates Forum to be held that Monday, 24 September. Both the VBCCO meeting and the SDCC meeting will offer our citizens the opportunity to hear about significant city issues that will directly impact us now and in the future.  Come hear Council John Moss speak on this side of the issues.

Council Candidate Forums – Monday Sept. 24th & Wednesday Oct. 17th

Two great opportunities for you to become informed about the candidate choices for this years City Council election.

Monday September 24, 2012 – Virginia Beach Council of Civic Organizations (VBCCO) will sponsor a City Council Candidate Forum at 7:00pm in the Central Library

Wednesday October 17, 2012 – Lynnhaven River Now and SDCC will sponsor a City Council Candidate Forum at 7:00pm in the Cape Henry Collegiate Dryfus Auditorium.  For more information, click on this flyer.  Flyer for Candidates’ Forum