CIP projects info added to our HOT page

Our HOT page is here.

Here’s what was added:

Shore Drive Corridor Improvements Projects

    2.116.000: Shore Drive Corridor Improvements – Phase II (Partial)
    This project will provide safety improvements, including pedestrian walkways and bikeways, along the Shore Drive corridor from South Oliver Drive/Waterspoint Place to Treasure Island Drive. It will also include improvements along Shore Drive at the Northampton Boulevard interchange and to the intersections at Pleasure House Road and at Greenwell Road.
    2.117.000: Shore Drive Corridor Improvements – Phase III (Partial)
    This project begins at Vista Circle, near the eastern end of the Lesner Bridge, and extends eastward through the Great Neck Road intersection and terminates at Croix Drive. This project will improve vehicular and pedestrian traffic flow and safety in the roadway and intersections; improve storm drainage; include a multi-use trail, 5-ft sidewalk and on-street bike lanes; and enhance the corridor with aesthetic elements such as landscaping and lighting.
    2.118.000: Shore Drive Corridor Improvements – Phase IV
    This project begins at the Marlin Bay Drive/Sandy Oaks Drive intersection and ends at the west end of the Lesner Bridge. This project will improve vehicular and pedestrian traffic flow and safety in the roadway and intersections; improve storm drainage; include a multi-use trail, 5-ft sidewalk and on-street bike lanes; and enhance the corridor with aesthetic elements such as landscaping and lighting. It will include improvements at the East Stratford Road intersection.

Note: projected end date of all infrastructure improvements of Shore Drive including replacing the Lesner Bridge is ~ September 2019.

COMMENT

This site uses Akismet to reduce spam. Learn how your comment data is processed.