Public Works page includes links to:
Construction drawings are being prepared for storm drainage piping along Poinciana Drive from Maple Street to Sandalwood Road. When the drawings are 60% complete, they will be presented to the public for review and comments. Construction and maintenance are planned for Poinciana Drive and along the Cape Henry Trail in Fall 2011.
Cape Henry – Cape Story Map
Overall Map
Draft: Shore Dr. Area Flooding
Lynnhaven Colony Map
Draft Report Cover
Shore Dr. Flooding West of Lesner Bridge page at VBGov.com should be public soon – the draft report from study how to fix tidal flooding is not quite ready yet according to P/W.