A piece of concrete fell from the bridge this morning, prompting the city to shut it down for about an hour while traffic engineering checked to “ensure that the bridge is safe,” said Officer Margie Long, a spokeswoman for the police department. It reopened at about 12:15 p.m.
Read more at Pilotonline.com.