ChesBay Bridge Tunnel getting pilings wrapped

The waters were calm on Tuesday as workers prepared 215 of the cylinder piles for new, snug-fitting jackets. The wrapping is lined with wiring and connected to zinc anodes below the water, a method called cathodic protection.
Read entire article at Pilotonline.com.

COMMENT

This site uses Akismet to reduce spam. Learn how your comment data is processed.